Rome Resources PLC - Final results for the year ended 31 December 2025
Released
Released
Announcement PDF
RNS Number : 6587J
Rome Resources PLC
25 June 2026
This announcement contains inside information for the purposes of Regulation 11 of the Market Abuse (Amendment) (EU
Exit) Regulations 2019/310. With the publication of this announcement via a Regulatory Information Service, this inside
information is now considered to be in the public domain.
25 June 2026
Rome Resources PLC
("Rome" or the "Company")
Final results for the year ended 31 December 2025
Rome Resources plc (AIM: RMR), the DRC-focused tin and copper explorer, announces its audited results for the year ended
31 December 2025.
Financial Performance
· Raised a total of £2.1 million in equity funding for the Company's DRC operations during 2025
· Cash at bank 31 Dec 2025 £1.42 million (2024: £4.33 million
Operational Highlights
· Conducted extensive drilling operations at the Company's Bisie North Project
· Issued an inaugural Mineral Resource Estimate for the Bisie North Project
Post-reporting Period Events
· Raised approximately £1.6 million in equity funding in the first half of 2026
· Executed non-binding term sheets to potentially acquire further interests in the existing Bisie North licences
· Completion of a further 3,250m drilling programme at the Bisie North Project
· Broader Kalayi intercepts from 2026 drilling has verified geological model
· Commencement of an airborne geophysical survey to assess scale
· Signed option agreement over a Canadian tin-tungsten-molybdenum-indium play
· Appointed Stephane Irung and Edward Loye as Non-executive Directors
Paul Barrett, Chief Executive Officer of Rome Resources, commented:
"The successes of the operations in the DRC during 2025 and into 2026 were marred by the untimely passing of Mark Gasson,
co-founder and COO. His guidance and enthusiasm were critical to getting the Company to where it is today, with a Maiden
Mineral Resource on the Bisie North Project and the potential for further upside to this following another drilling campaign
that focussed on the Kalayi tin deposit.
The Maiden Mineral Resource Estimate laid down a marker for the Company - strong tin grades from surface in Kalayi and
significant copper, zinc and silver alongside tin in Mont Agoma form a basis for resource growth going forward. Exploration
operations have continued into 2026 with further drilling and an airborne geophysical survey, the latter designed to identify
additional mineral exploration targets along the tin trend and closer to the granite contact. Work started on a small-scale
mining operation at Kalayi, which will produce tin from near-surface workings that will provide information for the conversion
to a full exploitation licence and valuable technical information about the deposit.
The Company is pursuing a new tin play in Eastern Canada, having entered into an option arrangement over several claims in
the Devonian tin-tungsten-indium play of SW New Brunswick, adjacent to the historical Mount Pleasant tungsten mine.
Fieldwork is planned in summer 2026 ahead of a possible drill programme in 2027. New Brunswick is a resource-friendly
jurisdiction with exceptional mineral potential, and we look forward to advancing this early-stage project (subject to
exercising the option).
By the end of the current reporting period, the Company should be in a strong position having added value to its projects in
both the DRC and Canada and we look forward to keeping shareholders appraised of our progress."
Posting of Annual Report and Accounts
The Group also announces that it will today be posting to its shareholders the annual report and accounts.
A copy of this announcement and the Company's report & accounts will shortly be available on the Company's website.
For further information, please contact:
Investor questions on this announcement
We encourage all investors to share questions
on this announcement via our investor hub
https://romeresources.com/link/eNblze
Rome Resources Plc
Paul Barrett, Chief Executive Officer
Tel. +44 (0)20 3143 6748
Allenby Capital Limited (Nominated Adviser and Joint Broker)
John Depasquale / Vivek Bhardwaj (Corporate Finance)
Kelly Gardiner / Lauren Wright (Sales & Corporate Broking)
Tel. +44 (0)20 3328 5656
OAK Securities (Joint Broker)
Jerry Keen, Head of Corporate Broking
Henry Clarke, Head of Sales
Tel. +44 (0)20 3973 3678
Camarco (Financial PR)
Sam Morris / Tomisin Ibikunle
Tel. +44 (0)20 3757 4980
Subscribe to our news alert service: https://romeresources.com/auth/signup
Qualified Person Statement
Dr. Paul Armitage is a consultant of Rome Resources plc, a qualified geologist, a Fellow of the London Geological
Society and a Member of the Institute of Materials, Minerals and Mining. Dr. Armitage is a qualified person (QP)
under NI 43-101 and as defined by the AIM Note for Mining, Oil and Gas Companies for the purposes of this
announcement and has reviewed and approved the scientific and technical information contained in this news
release.
Chairman's Statement
For the Period Ended 31st
December 2025 ("FY2025")
Highlights for FY2025
• Conducted extensive drilling operations at the Company's Bisie North Project
• Issued an inaugural Mineral Resource Estimate for the Bisie North Project
• Raised a total of £2.1 million in equity funding for the Company's DRC operations during 2025
• Cash at bank 31 Dec 2025 £1.418 million (2024: £4.485 million)
Post-Balance Sheet Events
• Raised approximately £1.6 million in equity funding in the first half of 2026
• Executed non-binding term sheets to potentially acquire further interests in the existing Bisie North licences
• Completion of a further 3,250m drilling programme at the Bisie North Project
• Broader Kalayi intercepts from 2026 drilling has verified geological model
• Commencement of an airborne geophysical survey to assess scale
• Signed option agreement over a Canadian tin-tungsten-molybdenum-indium play
• Appointed Stephane Irung and Edward Loye as Non-executive Directors
Chairman's Statement
I am delighted to present Rome's 2025 report, completing almost a year of intense exploration activity and culminating in the
publication of a maiden Mineral Resource Estimate ('MRE') for the Company's flagship project, Bisie North, situated in a
remote part of the Democratic Republic of Congo (the "DRC"). Bisie North lies in the world's highest grade tin producing
fairways and is only 8km along strike from a mine producing approximately 7% of the world's tin which is reported to
currently generates monthly revenues of around $80 million. Replication of this success is the Board's key objective. The last
12 months have therefore been focussed on the execution of a tin exploration drilling programme on Rome's existing
licences.
2025 saw the tragic death of Mark Gasson, co-founder and COO of Rome, following a short illness. His guidance and
knowledge was pivotal to the project and his experience of the regional tin play was critical in identifying the Bisie North
project as having great potential, subsequently borne out in the drilling results. His enthusiasm for the exploration game is
sorely missed.
FY2025 saw the continuation of the drilling activity initiated in 2024 on the Kalayi and Mont Agoma deposits in the Bisie
North Project, situated in the DRC, that culminated in the publication of a maiden Mineral Resource Estimate in October
2025. Almost 10,000m of core drilling had taken place following on from Rome's successful admission to trading on AIM in
July 2024 and subsequent secondary fundraises.
This drilling has now matured the previously identified Kalayi and Mont Agoma tin and polymetallic discoveries with an initial
MRE confirming 11kt contained tin in the shallow drilled portion of the deposits, along with 45kt of contained copper, 86kt of
zinc and 1.5Moz silver. Current focus is to quantify the undrilled potential in Kalayi which, because of its simple tin-based
mineralogy, potentially presents a faster monetisation route for Rome shareholders. Additionally, however, metallurgical
studies on the Mont Agoma polymetallic system have shown highly encouraging results in terms of recoverability to support
taking this project forward.
It has been another pivotal year for the Company, building out the resources at Bisie North and creating a platform for value
growth in an exciting commodity space. Tin and copper are both on track for strong long-term price growth and in parallel
the DRC is becoming a mainstream destination for resource investment, as discussed below.
In addition to the DRC, Rome has entered into an option agreement to acquire working interests in early-stage exploration
licences in the Canadian province of New Brunswick (the "Option Agreement"), in an extremely promising tin-tungsten-
indium play, centred around a Devonian age tin and tungsten endowed granite system containing the historical Mount
Pleasant tungsten mine. This is an early-stage project which will concentrate on field-based sampling during 2026 to develop
a focussed exploration model for the area.
Board Changes
During the reporting period, there were several changes at Board level: Marc Mathenz and Edouard Etienvre stepped down
in late 2025 whilst Stephane Irung, a DRC-based entrepreneur, was appointed as a non-executive director in April 2026. Ed
Loye, an experienced resource geologist, was announced as a proposed non-executive director of Rome, in April 2026. As of
the date of this report, the Board is as follows:
Klaus Eckhof (Non-Executive Chairman)
Paul Barrett (Chief Executive Officer)
Stephane Irung (Non-Executive Director) - appointed 17 April 2026
Edward Loye (Non-Executive Director) - appointed 10 June 2026
Philip Knowles' Chief Financial Officer role is a non-board position.
Outlook
The Board anticipates that the updated Mineral Resource Estimate will be completed mid-2026, following receipt of the
assays from the 2025/2026 drill campaign that completed in April 2026. It is expected that this update, which will focus on
Kalayi, will provide confirmation of the wider intercepts that have been encountered in this programme and quantify their
effect on the resource numbers.
In addition, the Company is participating in an airborne geophysical survey around the northern margin of the Bisie tin
granite, including the whole of the Company's licence area. It is anticipated this survey will identify drilling extensions and
further exploration targets in and around Kalayi and Mont Agoma for future campaigns.
The Board is very appreciative of the continued support of existing shareholders, as demonstrated in their support in funding
the Company's drilling campaigns. It is the Board's intention to maximise the value of Kalayi and Mont Agoma with the drill
bit and create an opportunity to generate significant returns for shareholders.
Klaus Eckhof
Chairman
24 June 2026
CEO's Report
For the Period Ended 31st
December 2025
During the year ended 31 December 2025, some 3,170m of drilling took place at the Company's flagship Bisie North
project. A maiden Mineral Resource Estimate was prepared for the company by The MSA Group (Pty) Ltd ("MSA") ,
detailed below.
Subsequent to the reporting period, between January 2026 to April 2026, further drilling of 3,250m was achieved. Rome
has completed a total of 9,780m of core drilling since its admission to trading on AIM in July 2024.
Project Background
The Bisie North Project is situated in eastern DRC, some 250km southwest of the city of Kisangani. The Bisie North Project
is contained across two licences - PR15130 and PEPM13274 with a total area of 35 km2. The world-class Alphamin tin
mine at Bisie North, the highest tin grade mine in the world, is situated 8km to the southeast of Rome's field camp, which
services exploration activities at the Mont Agoma and Kalayi drillsites as well as wider exploration activities.
Whilst the area is heavily forested and the bedrocks poorly exposed, a large tin-bearing granite has clearly been emplaced
to the south of the licence area, responsible for releasing mineral-rich fluids into the surrounding host rock, the
emplacement of these minerals being controlled further by NW-SE trending shear zones within the host rock
metasediments. Tin, copper, zinc and other mineral phases are associated with these near-granite shear zones and are
well-documented in the Bisie Mine. Mineralisation appears to increase towards the granite, but in both the Bisie Mine
and Rome's acreage it is not exposed. It is likely the contact between the granite and the host rocks in Rome's licences
runs along the course of the Oso River in the south of the licences. The 2026 airborne geophysical survey is anticipated,
among other things, to better define this key geological contact.
Mineralisation has been encountered to date in two areas in the Rome licence areas - Kalayi and Mont Agoma. Kalayi is a
pure tin play with cassiterite (tin oxide ore) found associated with quartz veins in sheared metamorphic zones. Several
steeply dipping high grade tin ore shoots are seen in Kalayi, striking northwest-southeast and dipping to the northeast.
Mont Agoma, en echelon with Kalayi, is similarly hosted in steeply dipping metamorphics though contains significant
sulphide deposits in terms of copper and zinc, with tin and silver. The sulphide mineralisation, which is pervasive and high
grade, is about 200m wide and with significant volume potential for copper and zinc, with additional silver and tin credits.
Operations
The Company continued its campaign of core drilling on the Mont Agoma and Kalayi deposits through 2025. The majority
of 2025 concentrated on Mont Agoma, whilst the subsequent early 2026 campaign focused on Kalayi.
The drilling performance has been greatly improved following the addition of an external drilling supervisor and
alternative drilling crews. Drilling operations in remote areas requiring helicopter support are prone to lengthy delays if
spare parts are required at short notice. Consequently, planning ahead of potential downtime events has improved the
overall drilling rates and as a consequence the per metre cost of drilling activity.
During May 2025 the advance of the M23 forces out of the Goma area towards the local hub of Walikale prompted a short
shutdown and evacuation of both Rome and Alphamin personnel. This was out of an abundance of caution and the M23
forces did not get closer than Walikale (70 km from site) before retreating back to the east. The shutdown lasted 40 days
and subsequent to this there have been no issues and no trigger points have been crossed to warrant further action. It is
our understanding that exports from the nearby Alphamin mine have continued uninterrupted since the restart of
operations.
2025 Mineral Resources Estimate
Following the completion of the Company's 2024/2025 drilling programme at Rome's Kalayi and Mont Agoma prospects,
the Company engaged MSA to prepare a maiden Mineral Resource Estimate (MRE) in respect of its Bisie North project, key
findings are summarised below.
The maiden MRE assesses the volumes associated with the tin intercepts previously reported at Kalayi and Mont Agoma
along with the copper, zinc and silver encountered in Mont Agoma. The Eastern Tin Zone, seen in the shallow weathered
zone of a single drillhole at Mont Agoma, was not included in the maiden MRE, as it awaits confirmation from further
drilling.
The Bisie North maiden MRE is based on diamond drillholes that were drilled from 2023 to 2025 by Rome. The Mont
Agoma maiden MRE is based on the results of 33 diamond drillholes and there were eighteen diamond drillholes
completed at Kalayi.
The maiden MRE was prepared in accordance with the CIM Best Practice Guidelines and was reported in accordance with
the 2014 CIM Definition Standards for Mineral Resources & Mineral Reserves.
Mont Agoma
Mont Agoma is a 200m wide polymetallic zone hosted in steeply dipping sheared metavolcanics and metasediments. It is
believed the metavolcanics are the source for the sulphide phases of copper and zinc, whereas the tin granite to the south
is responsible for the delivery of tin oxide bearing fluids in a separate mineralisation event associated with chloritisation.
The Mont Agoma MRE is reported using a net smelter return cut-off of 90 USD/tonne. A summary of the Mont Agoma
MRE is presented in Table 1 (as announced by the Company on 30 October 2025).
Table 1
Mineral Resource Estimate for Mont Agoma as at 29 October, 2025 at a 90 USD/tonne NSR cut-
off
Category Tonnes
(Mt)
NSR
(USD/t)
Cu
(%)
Sn
(%)
Zn
(%)
Ag
(g/t)
Cu
(kt)
Sn
(kt)
Zn
(kt)
Ag
(Moz)
Inferred 3.16 166 1.45 0.19 2.72 14.3 45.9 6.1 86.2 1.46
Total 3.16 166 1.45 0.19 2.72 14.3 45.9 6.1 86.2 1.46
Mont Agoma mineralisation starts at surface, as evidenced by strong copper and tin soil anomalies. As is common in a
large number of global copper-tin deposits, the copper dominates the shallow part of the zone, with tin strengthening at
depth, Mont Agoma's shallow drilling to date has encountered significant high grade copper, with thinner, lower grade tin
intercepts. As in the Bisie Mpama mines to the southeast, it is anticipated these tin grades and intercepts will increase at
depth, as is also seen in Kalayi.
Kalayi
Kalayi is a simple tin-only mineralised system present in multiple steeply dipping shoots of quartz veins hosted in a NW-SE
striking chloritised metasediment zone. The Kalayi MRE is reported at a cut-off grade of 0.85% tin (Sn). A summary of the
Kalayi MRE is presented in Table 2 (as announced by the Company on 30 October 2025)..
Table 2
Mineral Resource Estimate for Kalayi as at 29 October, 2025 at a 0.85% Sn cut-off
Category
Tonnes
(Mt)
Sn Grade
(%)
Sn Content
(kt)
Inferred 0.33 1.36 4.47
Total 0.33 1.36 4.47
Earlier drilling of the Kalayi tin deposit, which is present from surface, has proven narrow, yet high grade shallow
intercepts which have given way to wider high-grade intercepts at depth with subsequent early-2026 drilling.
Further drilling following the end of the reporting period drilled significantly wider high grade tin intercepts in Kalayi than
previously encountered. These intercepts are now in the process of being assayed and will feed into a revised mineral
resource estimate in due course.
Metallurgical Studies
Whilst the Kalayi tin ore exhibits a simple single-commodity chemistry, the Mont Agoma ore has significant copper and
zinc which it is necessary to assess for recovery in the processing design.
Samples of copper and zinc ore were delivered from the Mont Agoma deposit to the SGS laboratory in Lakefield, Canada.
These samples were subjected to mineralogical and exploratory metallurgical testing to determine the amenability to
commercial extraction.
The results of these tests were highly encouraging.
Copper
The main copper mineral in the copper ore sample is chalcopyrite (8.2%) with minor chalcocite (0.1%) and the sample
assayed 2.92% copper and 0.78% zinc.
The sample responded well to flotation processes and there is scope to pre-concentrate the flotation feed with gravity and
magnetic separation due to the quartz and iron oxides content reported in the mineralogy. Rougher flotation delivered a
concentrate of 8.9% Cu with a copper recovery of 97%. The first timed rougher concentrate graded 18% Cu indicating that
cleaner flotation would deliver a concentrate suitable for smelting.
Zinc
The main zinc mineral in the zinc ore sample is sphalerite (27.1%), which assayed at 13.5% zinc. The ore responded well to
flotation with recoveries over 99% to concentrate.
Rougher flotation delivered a concentrate grading 37.1% Zn with a zinc recovery of 99.1%. The first timed rougher
concentrate assayed 52.1% Zn with a zinc recovery of 89.6%, indicating that cleaner flotation should deliver a concentrate
suitable for smelting.
Canadian Critical Minerals Project
Post year end, on 10 March 2026, it was announced that Rome entered into the Option Agreement, covering a number of
mineral claims that were posted in the region of the Mount Douglas Granite, a Devonian-age tin-tungsten enriched granite
system associated with the Mount Pleasant deposit.
Under the Option Agreement and as operator of the licence associated with the Option Agreement, Rome will fund an
exploration programme to evaluate the previously identified mineral showings, primarily of tin and tungsten. This
programme, to be conducted through the summer season of 2026, will be a combination of soil sampling and trenching.
On Schoular Mountain, 3km east of the undeveloped Mount Pleasant Fire Tower tin zone, surface sampling will take place
along historical IP profiles which showed encouraging resistivity response. In the Square Lake area, surface sampling
around historical workings will be taken and assessed for molybdenum and tin potential. Finally, the Victoria Lake cluster
of tin-bearing greisen occurrences will be sampled by trenching in order to assess their extent and suitability for drilling in
2027.
The Directors believe that this initial entry into the Maritimes critical mineral play, at a time when the Province of New
Brunswick is operating an active strategy of mineral resource development against the global supply constraint outlook, is
extremely timely.
Local Communities, Health, Safety and Environment
The Company maintains a strong commitment to the local community in the Bisie region. Demonstrating this
commitment, over 40 local personnel are employed to manage both the day-to-day aspects and the security of the
operation during the drilling phase along with Congolese national technical staff. The Company maintains a good
relationship with the small artisanal operators in the stream section at Kalayi.
There have been no lost-time incidents or environmental incidents reported during the reporting period. The
environmental footprint of the operation is minor. The Board note the recent Ebola outbreak in the DRCX. Whilst the
outbreak is currently not affecting the region in which the Group operates, nor in any of the transit routes used by Rome's
staff, the Board continue to monitor the situation closely.
Mozambique Legacy Claim
There has been limited progress with the settlement of the claim, which came about as a result of the expropriation of a
historical ilmenite sand licence in Mozambique. As announced by the Company on 20 March 2025, while it was agreed
that 5 replacement licences would be allocated to IM Minerals, the Company has received no confirmation that this has
taken place. The Directors continue to pursue a resolution but note that the Company's existing operations will not be
significantly impacted by this process.
Outlook
After a year of intense exploration activity, the Company is poised to update the Kalayi tin mineral resource estimate and
quantify the additional exploration potential from an airborne geophysical survey. Additional drilling on Mont Agoma is
anticipated in order to drill the previously defined copper and tin exploration targets.
The Directors are working towards a commercial solution for both the Kalayi tin and the Mont Agoma polymetallic assets
as well as developing the promising early-stage critical minerals project in Canada. It is expected that this year will deliver
results on all of these fronts.
Paul Barrett
Chief Executive Officer
24 June 2026
Directors and strategic report
for the Period Ended 31 December 2025
Overview
It has been an active year for the Company, pressing ahead with the drilling of both Mont Agoma and Kalayi, resulting in
the publication of a maiden Mineral Resource Estimate. Drilling continued into 2026 with the aim of adding additional
resource through deeper drilling. In addition, also in early 2026, the Company entered into the Option Agreement in
connection with areas of an exciting tin-tungsten play in eastern Canada.
The Company appreciates the continued support of its shareholders in facilitating funding of the venture through 2025
and into 2026.
Cash Balance
The Group's cash balance as at 31 December 2025 was £1,418,000 (2024: £4,485,000).
Dividends
The directors do not recommend the payment of a dividend (2024: £nil).
Events since the end of the year
Information relating to events since the end of the year is given in note 19 to the financial statements.
Directors
The directors who held office at any time during the year ended 31 December 2025 are as follows:
P Barrett
K Eckhof
M Gasson (resigned 14 November 2025)
E Etienvre (resigned 11 December 2025)
M Mathenz (resigned 11 December 2025)
S Tschitembu (resigned 1 September 2025)
The Company has agreed to indemnify its directors against claims against them by reason of the fact that they are or
were a director of the Company, and the Company has in place a directors and officers insurance policy.
The Board of Directors is responsible for overseeing the long-term success and strategic direction of the Company in
accordance with the schedule of matters reserved for board decision and is responsible for monitoring the activities of
the executive management.
Directors' interests in shares
As at 31 December 2025, the interests of the directors' beneficial interests in the shares of Rome Resources Plc (including
the beneficial interests of their immediate family) were as follows:
No. shares held at
31 December 2025
No. shares held at
31 December 2024
Paul Barrett 13,610,108 3,610,108
Klaus Eckhof 439,624,500 475,724,500
Details of directors' remuneration is disclosed in Note 4.
Details of directors' interests in share options and warrants is given in Note 16.
Political donations and expenditure
No charitable or political contributions were made during the current or previous year.
Significant shareholders
As at 22 June 2026, the registered holders of 3% or more of the Ordinary Shares were as follows:
Shareholder No. of Ordinary Shares
held
% of issued share capital
held
Stanvic Mining SARL 1,200,000,000 15.63%
Andreas Reitmeier 490,075,000 6.38%
Klaus Eckhof 439,624,600 5.73%
The Estate of Mark Gasson 401,351,600 5.23%
Principal risks and uncertainties
Liquidity risk
The Group has no revenue at the present time and is therefore dependent upon the availability of additional equity
finance, which is described in further detail in note 1 to the financial statements under the going concern section of
the accounting principles. The availability of additional funding could be influenced by a wide range of factors and
risks.
Political Risk
The company's operations are in the democratic Republic of Congo, where unrest and ethnic violence has been a
factor in the east of the country for several decades. Whilst the operations continue as normal for the most part,
there are occasions where, out of an abundance of caution, the Company pauses its operations. However, the
emergence of commercial arrangements with the US government on minerals in the DRC, including the potential for
security guarantees, has reduced the perceived risk from insurgents. This has been underscored by International
Resource Holding's (owned by the Abu Dhabi Sovereign Wealth fund) C$503 million acquisition of a 56% stake in the
Alphamin tin mine, close by Rome's area of operation.
Dependence on key personnel
The Group and Company is dependent upon its executive management team. Whilst it has entered into contractual
agreements with the aim of securing the services of these personnel, the retention of their services cannot be
guaranteed. The development and success of the Group depends on its ability to recruit and retain high-quality and
experienced staff. The loss of the service of key personnel or the inability to attract additional qualified personnel as
the Group grows could have an adverse effect on future business and financial conditions.
Financing risk
The Group has an ongoing requirement to fund its activities through the equity capital markets. There is no certainty such
funds will be available when needed. To date the Group has managed to raise the required funds, primarily through equity
placements, including placements undertaken during difficult market conditions. The Directors have prepared cash flows
forecasts for at least the next 12 months from the date of this report and are confident that the Company will be able to
access sufficient financial resources to fund its operations through further equity raises as required during the period.
Health and safety risk
The Group's primary operations are based in the DRC, a country that is currently experiencing an outbreak of Ebola.
Whilst the outbreak is currently not affecting the region in which the Group operates, or which the Company's staff travel
through, the Company continues to monitor the situation and continually assesses the risks associated with the virus
outbreak spreading to the region and how that may impact the Group's workforce, local communities and its operations.
Internal controls and risk management
The directors are responsible for the Group's system of internal financial control. Although no system of internal
financial control can provide absolute assurance against material misstatement or loss, the Group's system is
designed to provide reasonable assurance that problems are identified promptly and dealt with appropriately.
In carrying out their responsibilities, the directors have put in place a framework of controls to ensure as far as
possible that ongoing financial performance is monitored in a timely manner, that corrective action is taken and that
risk is identified as early as practicable. The directors keep under constant review, the effectiveness of the internal
financial controls, with a strong focus on monitoring the cash position and future cash flows of the business.
Disclosure in the strategic report
Strategic matters relating to the Company throughout the reporting period, including the main trends and factors
likely to affect the future development, performance and position of the business, are outlined in the Chairman's
Statement.
Section 172 Statement
The Directors have a duty under Section 172 of the Companies A
Share your feedback
Discover