Rome Resources PLC - Mont Agoma Resumes Drilling, Strikes Copper & Zinc
RNS Number : 5402I
Rome Resources PLC
14 May 2025
This announcement contains inside information for the purposes of Regulation 11
of the Market Abuse (Amendment) (EU Exit) Regulations 2019/310. With the
publication of this announcement via a Regulatory Information Service, this inside
information is now considered to be in the public domain.
14 May 2025
Rome Resources PLC
("Rome" or the "Company")
Mont Agoma delivers Broad Copper and Zinc Intersections as Drilling Resumes in the
DRC
Rome Resources Plc (AIM: RMR), the DRC-focused tin and base metals explorer,is pleased
to announce assay results from drill holes MADD024 and MADD026 at its Mont Agoma
prospect, which continues to return large intercepts of near-surface and high-grade
polymetallic mineralisation (see Figure 1 below).These assay results confirm the
continuation of broad copper and zinc mineralisation over a 176m mineralised envelope
in hole MADD024 and supports the Company's exploration model of a polymetallic
system transitioning into deeper tin mineralisation.
Assay Highlights
·
MADD024:
o 14.8m @ 0.67% Cu from 59.1m, incl. 0.7m @ 2.32% Cu from 62.4m
o 13.4m @ 1.26% Cu from 109m, incl. 2.83m @ 2.13% Cu from 119.6m
o 14.5m @ 1.57% Cu from 174m, including 5.13m @ 3.00% Cu from 180.4m
o Tin visible over a 28m interval, reinforcing depth-related zonation
·
MADD026:
o 54m @ 3.41% Zn from 113m, incl. 21m @ 5.96% Zn from 126m
o 20m @ 1.23% Cu from 193m, incl. 5.10m @ 3.12% Cu from 193.9m
o Tin visible over a 15m interval
System scale: Copper and zinc confirmed across a 500m strike and >200m width
· Next phase: Deeper tin targets now being drilled in short 3,000m campaign
·
Drilling continues to support the Company's zonation model with shallower copper and
zinc transitioning into tin at depth- that the Board considers akin to well-known,
established tin projects like San Rafael in Peru and South Crofty in the UK, both of which
started as copper mines, passed through a transition zone of tin and copper until both
were ultimately only mining tin.Notably, both holes reported visible cassiterite in the
core, with mineralisation widening at depth and tin appearing near the base of the
copper zones.
Ongoing Work and Exploration Focus:
· Polymetallic footprint continues to grow: Drilling to date has defined polymetallic
mineralisation over 500m of strike length and a width of more than 200m,
mineralisation remains open at depth and along strike.The system remains open
at depth and along strike, with step-out drilling in progress.
.
·
Copper mineralisation confirmed in broad zone:HoleMADD024 returned
mineralisationwithin a broad 176m mineralised envelope, including up to 14.5m @
1.57% Cu from 174m (including 5.13m @ 3.00% Cu from 180.4m). MADD026
reported a best intercept of 20m at 1.23% Cu from 193m including 5.10m @ 3.12%
Cu from 193.9m.
·
Tin zones strengthening at depth: Cassiterite observed in both hole MADD024
(28m interval) and hole MADD026 (15m), consistent with the zonation model. Tin
mineralisation is typically hosted within three sub-parallel structures that widen
with depth, combining to 25-40m in thickness.
·
Best tin grades to date in southeast:Hole MADD009, drilled in the southeast,
returned 6.65m @ 0.53% Sn from 45.35m, including 2m @ 1.33% Sn-underscoring
southeast and deeper drilling as high-priority targets.
· Metallurgical studies underway:Rome hasappointed a specialistmetallurgist to
advance mineralogical, metallurgical and processing studies - focused on
economic beneficiation of tin, copper, zinc and silverfrom the Mont Agoma and
Kalayi systems.
·
Resource estimates pending:Maiden inferred mineral resource estimates for tin,
copper and zinc at Mont Agoma - and tin at Kalayi -are in progress, with publication
expected in the near term.
· 3,000m drilling programme underway:Three diamond core drill rigs are expected
to complete the programme at Mont Agoma in the second half 2025as part of a
short 3,000m campaign focused on deeper tin targets and step-out drilling to
expand the polymetallic footprint.
Paul Barrett, Chief Executive Officer of Rome Resources Plc, commented:
"The exploration at Mont Agoma continueswith the recent resumption of drilling. A number of key tin targets are planned
to be drilled, which will allow us to fine tune the geological model and improve our understanding of how the three key
commodities - copper, zinc, and tin - are distributed within the mineralised system. The results to date are highly
encouraging, confirming consistent copper and zinc near surface with tin strengthening at depth - exactly the zonation
profile we anticipated.
"This short 3,000 metre campaign is focused on targeting deeper tin mineralisation, and regular updates are anticipated
in the coming months as results are received, along with the Company's inferred mineral resource estimate for both Mont
Agoma and the nearby Kalayi tin prospect. These steps mark important progress in demonstrating the scale and value of
this emerging polymetallic system."
Mineralisation at Mont Agoma:
Results from the exploration drilling at Mont Agoma have reinforced the model of a
shallow, predominantly copper and zinc mineralisation system passing at depth into a tin
zone. The Figure 1 below illustrates these findings as follows:
· The displayed contours are of 'tin potential', being an indicator of tin richness - the
product of average grades above 0.1% and zonal thickness.
· The results to date indicate a strong increase in tin potential in the deeper parts of
the mineralised zone
· Mineralisation plunges in broad terms to the northwest, bringing the tin zone
shallower in the southeast
· Also shown are the planned hole penetrations targeting principally the deeper tin
for the current drilling campaign
Figure 1
There is, in addition to the deeper tin potential, very significant copper and zinc
mineralisation already found in the shallower drill holes. This base metal occurrence is
considered important for two reasons - it represents the overburden that will require
stripping during early-stage mining operations and it provides a strong opportunity for
incremental resource value.
The current drill programme is planned primarily to test the grade and width of tin
mineralisation at pierce points shown on the long section at much deeper levels than
that has been drilled to date. A single drill hole has additionally been planned to test the
continuation of tin mineralisation to the south of a possible fault. Provision has also been
made for additional drill holes once the tin zone has been located, taking into account
that the best tin intercepts were located in the southern area drilled to date.
The Board considers that all results to date support the model for this style of
mineralisation being analogous to that evidenced at San Rafael in Peru and South Crofty
in the UK. Indications are that Rome's drilling is within the transition zone in the southern
portion of the drilled area where grades have increased with a marked decrease in
copper mineralisation.
MADD024 and MADD026 Results
Results are considered to further support a north plunging mineralised system where
best tin grades were reported in the southernmost drill holes, while MADD024 and
MADD026 over the northern portion reported lesser grades - 27.8m at 0.13% Sn from
157,2m (MADD024) and 9.5m at 0.12% Sn from 174m and 5.5m at 0.29% Sn from 193m
(MADD026).
Copper mineralisation was identified within a number of zones within a broader 176m
mineralised envelope in MADD024 which included up to 14.5m at 1.57% Cu from 174m
(including 5.13m at 3.00% Cu from 180.4m) while MADD026 reported a best intercept of
20m at 1.23% Cu from 193m including 5.10m @ 3.12% Cu from 193.9m. Both holes were
clearly drilled within the copper zone although distinct bands of cassiterite mineralisation
were visible in the core which was mineralised over an interval of 28m in MADD024 and
15m in MADD026.
Copper mineralisation has been identified over significant widths in the northern area of
drilling at Mont Agoma where MADD018 reported copper mineralisation within a broader
148m envelope and is supported by a copper in soil anomaly which continues for a
further c. 1,000m to the northwest. Similar to the tin mineralisation, copper
mineralisation plunges to the northwest and pinches out before the last line of drilling in
the south. This further highlights the potential for high grade tin at even deeper levels in
the northern portion which included MADD024 and MADD026.
Zinc was intersected in both MADD024 and MADD026 with a best intercept of 54m at
3.41% Zn from 113m including 21m at 5.96% Zn from 126m in MADD026. Both drill holes
were stopped before reaching the continuation of the broader c100m wide zinc zone
intersected in MADD001 and MADD002.
All tin, copper, zinc and silver mineralised intercepts are summarised in Table 1.
Table 1:Average grades of mineralisation for Significant Intercepts and depths of zones
tested at Mont Agoma (0.1% cut-off grade for Sn, 0.5% cut-off grade for Cu and Zn;
maximum of 3m waste)
BHID
MADD024
incl.
MADD024
incl.
MADD024
From
59,1
62,4
79,7
80,6
89,4
109
110
115
To
73,9
63,1
84
81
90,05
122,43
114
116
Width
14,80
0,70
4,30
0,40
0,65
13,43
4,00
1,00
Sn%
Cu%
0,67
2,32
0,57
Zn%
0,54
0,61
1,26
1,53
0,94
Ag
(ppm)
incl.
MADD024
incl.
MADD024
incl.
MADD024
incl.
MADD024
incl.
incl.
MADD024
incl.
MADD024
incl.
MADD024
incl.
MADD024
MADD026
incl.
MADD026
incl.
MADD026
incl.
incl.
incl.
119,6
119,6
124
130,6
137,1
139,57
140
147,4
148,5
149,6
150
150
157,2
157,2
157,6
157,6
157,6
159,5
167,6
167,6
173,5
174
178,4
180,4
180,4
181,2
192
192,55
198,5
202,3
203,1
208,5
219,9
226,48
230
235
27,5
102
106
112
113
113
114
116
120
120,8
126
151
122,43
120
131,1
131,1
137,85
141
140,5
167
153,6
153,6
151
151
185
164
163,4
165
163,4
163,4
169,7
168
185
188,5
182
185,53
185,53
184,5
193,7
193
199,2
204,1
216
209,1
222
226,95
230,45
235,53
30
107
107
113
167
120
115
117
123
122
147
162
2,83
0,40
7,10
0,50
0,75
1,43
0,50
19,60
5,10
4,00
1,00
1,00
27,80
6,80
5,80
7,40
5,80
3,90
2,10
0,40
11,50
14,50
3,60
5,13
5,13
3,30
1,70
0,45
0,70
1,80
12,90
0,60
2,10
0,47
0,45
0,53
2,50
5,00
1,00
1,00
54,00
7,00
1,00
1,00
3,00
1,20
21,00
11,00
2,13
1,17
0,85
2,33
2,19
1,51
2,52
1,44
0,44
3,11
36
0,13
1,77
1,81
2,15
22
0,64
28
1,19
1,57
3,00
28
2,35
0,62
0,25
0,60
0,22
0,81
2,11
0,54
1,14
0,63
1,14
0,17
1,38
4,70
0,10
3,41
1,85
1,14
2,18
4,19
5,96
3,15
MADD026
incl.
MADD026
incl.
MADD026
157
157
157
164
173,5
174
174
181
193
193
193,4
193,9
193,9
209,5
218
159,5
161
157,55
164,5
187
183,5
175,3
181,5
198,5
213
195,4
199
195
209,9
219
2,50
4,00
0,55
0,50
13,50
9,50
1,30
0,50
5,50
20,00
2,00
5,10
1,10
0,40
1,00
0,38
24
0,14
1,05
0,12
4,90
0,29
1,23
38
3,12
0,20
0,19
For more information and the chance to have your questions directly answered by the
management team, please head to our interactive investor hub
via:https://romeresources.com/s/5b5af1. Here you will find all company news and
additional content to further explain Rome Resources' business
For further information, please contact:
Investor questions on this announcement
We encourage all investors to share
questions
on this announcement via our investor hub
Rome Resources Plc
Paul Barrett, Chief Executive Officer
Mark Gasson, Chief Operating Officer
https://romeresources.com/s/2b8304
Allenby Capital Limited (Nominated
Adviser and Joint Broker)
John Depasquale / Vivek Bhardwaj / Lauren
Wright (Corporate Finance)
Stefano Aquilino / Joscelin Pinnington (Sales &
Corporate Broking)
Tel. +44 (0)20 3328 5656
OAK Securities (Joint Broker)
Jerry Keen, Head of Corporate Broking
Henry Clarke, Head of Sales
Tel. +44 (0)20 3973
Camarco (Financial PR)
Emily Hall / Gordon Poole / Sam Morris
Tel. +44 (0)20 3143 6748
3678
4980
Tel. +44 (0)20 3757
Subscribe to our news alert service:https://romeresources.com/auth/signup
Qualified Person statement
Dr Deon Vermaakt is a consultant of Rome Resources plc, a qualified geologist and a
registered Professional Natural Scientist (Geological Science) with the South African
Council for Natural Scientific Professions (SACNASP Reg. No. 400074/03). Dr Vermaakt is a
qualified person (QP) under NI 43-101 and as defined by the AIM Note for Mining, Oil and
Gas Companies and has reviewed and approved the scientific and technical information
contained in this news release.
Drilling, core logging and sampling followed industry standards.
Three sample batches consisting of 452 samples were submitted for analysis, of these 57
were QAQC samples, i.e. 26 Certified Reference Material (CRM), 18 Blanks and 13
Laboratory Duplicate samples.
Although slightly lower than the CRM average, all CRM's returned acceptable results
within industry limits. The Blanks and Duplicate QAQC samples all returned acceptable
results.
Glossary
Ag
Cu:
M:
Ppm:
Sn:
Zn
Silver
Copper
Metres (Metric)
Parts per million (metric)
Tin
Zinc
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct
Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of
this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information
contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services.
For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy
Policy.
END
MSCGPUGPAUPAPGW
Share your feedback
Discover